I need to get assistant with this project
for Project budgeting. like I need to prepare time weekly budget.
ACTIVITY DURATION, COSTS AND RESOURCE REQUIREMENTS: From a more detailed analysis of the project activities, you have been able to estimate the duration, and resource requirements sold with various des related to the project. The information obtained from the detailed analyses is given in Table below TABLE 1: SUMMARY OF INFORMATION OBTAINED FROM DETAILED ANALYSIS Normalconcin Chcete Activity Description Duration Durs M Dream JON Director JALD THE PROJECT SCENARIO: Suppose you have been signed as the project manager for a project which your company has recently own through a competitive bidding. The client wait to build a manufacturing plant Aber aralysing the project activities and discussing with various supervisors you have been able to identify the following a relationships The project starts with the excavation for the boundarios The foundation for the building can only be wild once the foundation excavation has been frihed The rough wal can be placed only after the foundation has been laid The placement of rool requires the completion of rough wal works. The start of the weer pluribing work is dependent on the completion of rough wal work Interior plumbing card start their plumbing is complete Exterior siding a start the roof is in place The start of exterior painting requires the completion of the exterior siding and the exterior plumbing The electrical work can start on the rough wal is in place Wall board can be placed only after the interior plumbing and electrical works we complete Flooring and interior painting cannot start the wallboard work is complete Exterior tres can be led only after the completion of the watelor painting work. Interier fotos cannot be placed unifooning and Herior painting are congle. Installation of terrature makes the project ready for handover A 20% 1-X 18000 E 2800 7 4.X 320,000 2+ 420.000 . TEX C SALIN MODO Perug wat D Putup 8 250.000 -X El the worlumbing JE DOO 4+X 3 F Install the informing 5+X 100.000 7 3.X Puteri 200.000 5 4. Hotelor parting 200.000 3 8+ De theo TEX 210.000 3 SEX 3X 300 30.000 Pupward K 4X we 4 3. 5X De their pain 3X 3 2.X 3 1.X 200.000 N 30.000 7 3. wer XP dipto per cord of your data per PROIECT INDIRECT COM ALSO ACTIVITY DURATION, COSTS AND RESOURCE REQUIREMENTS: From a more detailed analysis of the project activities, you have been able to estimate the duration, and resource requirements sold with various des related to the project. The information obtained from the detailed analyses is given in Table below TABLE 1: SUMMARY OF INFORMATION OBTAINED FROM DETAILED ANALYSIS Normalconcin Chcete Activity Description Duration Durs M Dream JON Director JALD THE PROJECT SCENARIO: Suppose you have been signed as the project manager for a project which your company has recently own through a competitive bidding. The client wait to build a manufacturing plant Aber aralysing the project activities and discussing with various supervisors you have been able to identify the following a relationships The project starts with the excavation for the boundarios The foundation for the building can only be wild once the foundation excavation has been frihed The rough wal can be placed only after the foundation has been laid The placement of rool requires the completion of rough wal works. The start of the weer pluribing work is dependent on the completion of rough wal work Interior plumbing card start their plumbing is complete Exterior siding a start the roof is in place The start of exterior painting requires the completion of the exterior siding and the exterior plumbing The electrical work can start on the rough wal is in place Wall board can be placed only after the interior plumbing and electrical works we complete Flooring and interior painting cannot start the wallboard work is complete Exterior tres can be led only after the completion of the watelor painting work. Interier fotos cannot be placed unifooning and Herior painting are congle. Installation of terrature makes the project ready for handover A 20% 1-X 18000 E 2800 7 4.X 320,000 2+ 420.000 . TEX C SALIN MODO Perug wat D Putup 8 250.000 -X El the worlumbing JE DOO 4+X 3 F Install the informing 5+X 100.000 7 3.X Puteri 200.000 5 4. Hotelor parting 200.000 3 8+ De theo TEX 210.000 3 SEX 3X 300 30.000 Pupward K 4X we 4 3. 5X De their pain 3X 3 2.X 3 1.X 200.000 N 30.000 7 3. wer XP dipto per cord of your data per PROIECT INDIRECT COM ALSO