Answered step by step
Verified Expert Solution
Question
1 Approved Answer
I need your help solving this problem. Pls help me by answering and showing explanations. Use the material links at the bottom. Question 3: Mega
I need your help solving this problem. Pls help me by answering and showing explanations. Use the material links at the bottom.
Question 3: Mega Factory built a fabrication shop for a machinery fabricator in Boulder, Colorado in 2010. The superstructure part of the fabrication shop includes: 12 rectangular 24' high precast concrete columns (10 are large, 2 are small); and 17 structural steel beams ( beams required are shown below). c. Find the cost to build the superstructure of the fabrication shop (excluding the O&P) in 2010? d. If the Mega Factory want to build a similar factory in Boulder, Colorado, in 2015, what is the estimated cost? (Assume that project cost increase 3.2% from 2010 to 2015, due to inflation and other factors) (Use: (1) 2010 Location Factors - "Total", (2) Unit cost 2010) Type Material Quantity (E.A.) Length (L.F.) Early Start Duration Early Finish W21X44 Steel 4 35 W18X50 Steel 6 20 Activity Code W10X22 Steel A 35 Late Start Total Float Late Finish W10X22 Steel W 20Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started