Answered step by step
Verified Expert Solution
Question
1 Approved Answer
id is 01 There is an exploration well A which produces 300 cm/s. After the well works for 1.3 X 10s, a new well B
id is 01
There is an exploration well A which produces 300 cm/s. After the well works for 1.3 X 10s, a new well B starts to produce 600 cm3/s, and the new well is 105 cm away from the first well. The filtration process is non-steady state flow. We already known that K= (Last two digits of your ID) um, h=1200 cm, CE1.8 X 10-S atm-', ,=9 mPa's, I = 10cm. *- . M Well A M Well B (1) Calculate the pressure drop of the M point (at the middle of well A and B) after well A producing 2.6 X 106s later. (For students last digit of your ID is 1, 4 or 9). (2) Calculate the pressure drop of the M point (a quarter away from well B) after well A producing 2.6X 106s later. (For students last digit of your ID is 2, 6, 8 or 0). (3) Calculate the bottom hole pressure drop of the well B after well A producing 2.6X 106s later. (For students last digit of your ID is 3, 5 or 7) Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started