If activity - based costing is used, modifications made by engineering to the product design of several products would be classified as a a .
If activitybased costing is used, modifications made by engineering to the product design of several products would be classified as a
a batchlevel activity.
b unitlevel activity.
c facilitylevel activity.
d productlevel activity.