Question
I'm Having trouble determining what the constraints are to this linear programming problem. I know that i'm maximizing 55x + 45y , however; what constraints
I'm Having trouble determining what the constraints are to this linear programming problem. I know that i'm maximizing 55x + 45y , however; what constraints are subject to the maximization function? The problem is as follows:
NorCal Outfitters manufactures a variety of specialty gear for outdoor enthusiasts. NorCal has decided
to begin production on two new models of crampons: the Denali and Cascade. The company produces
crampons by first stamping steel sheets into the rough design, then assembling the base crampon with
toe and ankle straps. NorCal's manufacturing plant has 120 hours of stamping time and 80 hours of
assembly time assigned for producing these crampons.
Each set of Denali crampons requires 30 minutes of stamping time and 25 minutes of assembly time,
and each set of Cascade crampons requires 25 minutes of stamping time and 15 minutes of assembly
time. The labor and material cost is $15 and $10 for each set of Denali and Cascade crampons,
respectively. NorCal sells crampons through wholesale distributors for $55 for the Denali model and $45
for the Cascade model. The V.P of Production at NorCal believes that the Denali model, recently
featured in Outside Magazine, could become a bestseller and has determined that at least 60% of the
crampons produced by NorCal should be the Denali model.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started