Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Immediate help needed - No credit if the solution is not legible. Show your work. Answers without proper procedure do not count. Box your answers.

Immediate help needed -
image text in transcribed
No credit if the solution is not legible. Show your work. Answers without proper procedure do not count. Box your answers. Problem 1 A stamping press produces sheet-metal stampings in batches. The press is operated by a worker whose labor rate = $15.00 hr and applicable labor overhead rate 42%. Cost rate of the press-S22.50 hr and applicable equipment overhead rate 20%. In one job of interest, batch size-400 stampings, and the time to set up the die in the press takes 75 min. The die cost $40,000 and is expected to last for 200,000 stampings. Each cycle in the operation, the starting blanks of sheet metal are manually loaded into the press, which takes 42 sec. The actual press stroke takes only 8 sec. Unloading the stamping from the press takes 13 sec. Cost of the starting blanks-$0.23/pc. The press operates 250 days per year, 7.5 hours per day, but the operator is paid for 8 hours per day. Assume availability-|00% and scrap rate-0. Determine (a) cycle time (b) average production rate with and without setup time included (c) cost per stamping produced

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Knowledge Based System For Information System Audit

Authors: Amol B. Devale, R. V. Kulkarni

1st Edition

6200652376, 978-6200652379

More Books

Students also viewed these Accounting questions

Question

Does it avoid use of underlining?

Answered: 1 week ago