In 2002, GE offered a 1.5-77sle wind turbine in their 1-2 MW turbine portfolio. Since then, GE has gone on to advance their wind turbine
In 2002, GE offered a 1.5-77sle wind turbine in their 1-2 MW turbine portfolio. Since then, GE has gone on to advance their wind turbine technology and now offers a 1.85-87 wind turbine. What is the percent improvement in power output (kW) achieved by using the new 1.85-87 turbine instead of the old 1.5-77sle turbine, assuming the turbine is located in the best part of Michigan's thumb region