Question: In a job costing system, $ 4 5 , 0 0 0 has been charged to a job ( $ 2 5 , 0 0

In a job costing system, $45,000 has been charged to a job ($25,000 of direct materials, $10,000 direct labor, and $10,000 applied overhead). The job yields 500 units of a product, of which 100 are rejected by the entity as spoiled with no salvage value. The cost of the spoilage is determined to be $9,000. If the entity wishes to use this job as the basis for setting a spoilage standard for comparison with future work, the conceptually superior way to express the spoilage rate is
A.20% of total inputs.
B.36% of material inputs.
C.25% of good outputs.
D.90% of labor inputs.