In a process-costing system, unit costs are calculated by: a.multiplying unit variable costs by estimated overhead. b.adding all the variable costs per unit associated with
In a process-costing system, unit costs are calculated by:
a.multiplying unit variable costs by estimated overhead.
b.adding all the variable costs per unit associated with the units produced.
c.dividing the process costs for the given period by the output of the period.
d.subtracting total fixed costs from the applied overhead.
e.dividing the total costs associated with the units produced by the overhead cost.