In a proposed hydraulic power plant site, the available discharge in the river is 7 0 m 3 / s under a net Head of

In a proposed hydraulic power plant site, the available discharge in the river is
70 m3
/s under a net Head of 15 m. Assuming a turbine efficiency of 90% and the
Speed as 100 RPM, compare the following two proposals, both same size in so
far as the number of turbines are concerned.
(i) Francis turbines with a Specific Speed of 150.
(ii) Kaplan Turbines with a Specific Speed of 350.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Essentials of Materials Science and Engineering

Authors: Donald R. Askeland, Wendelin J. Wright

3rd edition

978-1111576868, 1111576866, 978-1285677620, 1285677625, 978-1111576851

More Books

Students also viewed these Mechanical Engineering questions