In operation is used to machine 10 kinds of parts. The total weekly requirements for all types of parts is 900. Each part requires 20
In operation is used to machine 10 kinds of parts. The total weekly requirements for all types of parts is 900. Each part requires 20 sec machine time. Assume the machine is to be scheduled for no more than 90% of the total time available time.A normal workweek is 40 hours week but 4 hours a week are reserved for normal machine preventive and repair maintenance. If the set up for each kind of part is one hour.
1) What is the max no of set ups per week.
2) what is the smallest allowable lot size, assuming all batches are of same size
3) To reduce the lot size in a) by 50%, what must be the set up time be reduced to ?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started