In regards to calculating C. of this question. How do you determine $460,000 as the total activity cost? the sum of $146k, $60k, $90k, $56k
In regards to calculating C. of this question. How do you determine $460,000 as the total activity cost? the sum of $146k, $60k, $90k, $56k and $96k is $448,000 and I'm a little confused on how $460,00 was determined.
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company consisted of the following activities and costs:
Setup (1,000 setup hours) | $ 146,000 |
Production scheduling (400 batches) | 60,000 |
Production engineering (60 change orders) | 90,000 |
Supervision (2,000 direct labor hours) | 56,000 |
Machine maintenance (12,000 machine hours) | 96,000 |
Total activity costs | $ 448,000 |
The following additional data were provided for Job 845:
Direct material costs | $ 8,000 |
Direct labor cost (5 Milling direct labor hours; 35 Finishing direct labor hours) | $ 1,000 |
Setup hours | 5 hours |
Production scheduling | 1 batch |
Machine hours used (25 Milling machine hours;5 Finishing machine hours) | 30 hours |
Production engineering | 3 change orders |
(a) Calculate the cost per unit of activity driver for each activity cost category.
(b) Calculate the cost of Job 845 using ABC to assign the overhead costs.
(c) Calculate the cost of Job 845 using the plantwide overhead rate based on machine hours. (Round your answer to the nearest dollar.)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started