Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

In the aftermath of Hurricane Thelma, the U.S. Army Corps of Engineers is considering two alternative approaches to protect a freshwater wetland from the encroaching

image text in transcribed

In the aftermath of Hurricane Thelma, the U.S. Army Corps of Engineers is considering two alternative approaches to protect a freshwater wetland from the encroaching seawater during high tides. The first alternative, the construction of a 5-mile long, 20-foot-high levee, would have an investment cost of $27,000,000 with annual upkeep costs estimated at $775,000. A new roadway along the top of the levee would provide two major benefits: (1) improved recreational access for fishermen and (2) reduction of the driving distance between the towns at opposite ends of the proposed levee by 11 miles. The annual benefit for the levee has been estimated at $1,000,000. The second alternative, a channel-dredging operation, would have an investment cost of $15,000,000. The annual cost of maintaining the channel is estimated at $325.000. There are no documented benefits for the channel-dredging project. Using a alternative, apply the incremental B-C ratio (ABIAC) method to determine which alternative should be chosen. (Note: The null alternative, Do nothing, is not a viable alternative.) In the aftermath of Hurricane Thelma, the U.S. Army Corps of Engineers is considering two alternative approaches to protect a freshwater wetland from the encroaching seawater during high tides. The first alternative, the construction of a 5-mile long, 20-foot-high levee, would have an investment cost of $27,000,000 with annual upkeep costs estimated at $775,000. A new roadway along the top of the levee would provide two major benefits: (1) improved recreational access for fishermen and (2) reduction of the driving distance between the towns at opposite ends of the proposed levee by 11 miles. The annual benefit for the levee has been estimated at $1,000,000. The second alternative, a channel-dredging operation, would have an investment cost of $15,000,000. The annual cost of maintaining the channel is estimated at $325.000. There are no documented benefits for the channel-dredging project. Using a alternative, apply the incremental B-C ratio (ABIAC) method to determine which alternative should be chosen. (Note: The null alternative, Do nothing, is not a viable alternative.)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Public Finance A Contemporary Application Of Theory To Policy

Authors: David N Hyman

10th Edition

053875446X, 978-0538754460

More Books

Students also viewed these Finance questions

Question

Why is environmental scanning necessary?

Answered: 1 week ago