In the last quarter of 1985/86 it is estimated that YNQ will have produced and sold 20 000 units of their main product by the
In the last quarter of 1985/86 it is estimated that YNQ will have produced and sold 20 000 units of their main product by the end of the year. At this level of activity it is estimated that the average unit cost will be:
{)
Direct material 30
Direct labour 10
Overhead: Fixed 10
Overhead: Variable 10
This is in line with the standards set at the start of the year. The management accountant of YNO is now preparing the budget for 1986/87. He has incorporated into his preliminary calculations the following expected cost increases:
Raw material: price increase of 20%
Direct labour: wage rate increase of 5%
Variable overhead: increase of 5%
Fixed overhead: increase of 25%
The production manager believes that if a cheaper grade of raw material were to be used. this would enable the direct material cost per unit to be kept to 31.25 for 1986/87. The cheaper material would. however, lead to a reject rate estimated at 5% of the completed output and it would be necessary to introduce an inspection stage at the end of the manufacturing process to identify the faulty items. The cost of this inspection process would be 40000 per year (including 10000 allocation of existing factory overhead).
Established practice has been to reconsider the product's selling price at the time the budget is being prepared. The selling price is normally determined by adding a mark-up of 50% to unit cost On this basis the product's selling price for 1985/86 has been 90 but the sales manager is worried about the implications of continuing the cost-plus 50% rule for 1986/87. He estimates that demand for the product varies with price as follows:
Price: 80 84 88 90 92 96 100
Demand (000): 25 23 21 20 19 17 15
a) You are required to decide whether YNQ should use the regular or the cheaper grade of material and to calculate the best price for the product, the optimal level of production and the profit that this should yield. Comment briefly on the sensitivity of the solution to possible errors in the estimates.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started