Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

In the summer, peak electricity loads can force the startup of temporary power plants called peaker plants . Peaker Plants are used to augment the

In the summer, peak electricity loads can force the startup of temporary power plants called peaker plants. Peaker Plants are used to augment the power supplied by the normal full time plants, called baseline plants. Suppose New Jersey Electric Power (NJEP) has baseline plants that can produce up to 18,000 MW (megawatts) as well as three peaker plants that can each add 500 MW of additional power.

In an emergency, NJEP can further reduce overall power consumption by up to 4% by dropping the transmission voltage (essentially, give everyone 4% less electric power than they want). This causes an intentional brownout. If power demand still exceeds what NJEP can handle using brownout conditions, they would be forced to implement rolling blackouts, which involves temporarily cutting power to a rolling subset of customers.

An epic 5-day heat-wave is forecast to hit New Jersey beginning in 24 hours. Based on the weather forecast, it is estimated that NJEP's peak load demand over each day of the 5 day heat-wave will be normally distributed with the following parameters:

Forecasted Peak MW Consumption

Day 1 Day 2

15000 16000 16500 17000 16500

1500 1600 1650 1700 1650

NJEP wants to decide how many peaker plants to fire up to reduce the probability of brownouts and/or rolling blackouts. The decision must be made soon to allow sufficient ramp up time.

Q. Assume NJEP fires up 2 peaker plants in advance of the heat wave.

  • What is the probability NJEP exceeds their total capacity for at least one day of the heat wave?
  • What is the probability they must resort tobrownouts[1]at peak load for at least one day during the heat wave?
  • What is the probability they must resort to rollingblackoutsat peak loadfor at least one day during the heat wave?

Q. Assume NJEP fires up all 3 peaker plants in advance of the heat wave.

  • What is the probability NJEP exceeds their total capacity for at least one day during the heat wave?
  • What is the probability they must resort tobrownoutsat peak load for at least one day during the heat wave?
  • What is the probability they must resort to rollingblackoutsat peak load for at least one day during the heat wave?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Non-Cooperative Game Theory

Authors: Takako Fujiwara Greve

1st Edition

4431556451, 9784431556459

More Books

Students also viewed these Mathematics questions

Question

Why are some firms dropping standard cost systems? Explain

Answered: 1 week ago

Question

understand the general outline and structure of the current book.

Answered: 1 week ago

Question

2. Value-oriented information and

Answered: 1 week ago

Question

1. Empirical or factual information,

Answered: 1 week ago

Question

1. To take in the necessary information,

Answered: 1 week ago