Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

In this project you will create a simulation model of a Pot Manufacturing Factory and will evaluate working with different batch sizes during production. We

In this project you will create a simulation model of a "Pot Manufacturing Factory" and will evaluate working with different batch sizes during production. We will assume that the factory produces one type of pot. The pot is made of aluminium metal and some components which are assembled. The aluminium metal is reshaped and painted. After processing aluminium main body of pot, handles are assembled to the main body, and a glass lid is attached.

The Factory

The factory works for 24 hours and 7 days a week. There are 8-hour 3 shifts in a 24-hour day for human workers.

Scenarios Specifying Batch Sizes

The objective of this project is to find out the differences between one-peace flow vs. batch flow. Batch flow is the enemy of Lean manufacturing and the idea in Lean manufacturing is to destroy unnecessary waiting, including batching". In the defined system above, there are 3 areas of batching; N1, N2, N3. Create 4 flows with the same layout, as described above (order arrivals, press forming ....). First flow will show the system when N1, N2, N3 are 10, 10, 10 respectively. Second flow will show the system when N1, N2, N3 are 10, 20, 10 respectively. Third flow will show the system when N1, N2, N3 are 20, 20, 20 respectively. Fourth flow will show the "one-peace flow" system so N1, N2, N3 are 1, 1, 1 respectively.

Output

Throughput, at the end of the week

Average total time in system

To Do:

1. Build a simulation model of the system described above using Simul8. 2. Add texts in Simul8 model to display the values of outputs for each of the four scenarios. 3. Add a text which includes your comment about how you interpret your model's outputs.

To Deliver:

1. Your Simul8 file.Pot Manufacturina Processes image text in transcribed

Dat Manifartrinn Drarocesc

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Business Dynamics Systems Thinking And Modeling For A Complex World

Authors: John Sterman, John D. Sterman

1st Edition

007238915X, 9780072389159

More Books

Students also viewed these General Management questions