Question
Instructions: In all of the exercises involving variances, use F and U to designate favorable and unfavorable variances, respectively. E8-1 and E8-2 use the following
Instructions:
In all of the exercises involving variances, use "F" and "U" to designate favorable and unfavorable variances, respectively.
E8-1 and E8-2 use the following data:
The standard operating capacity of Tecate Manufacturing Co. is 1,000 units. A detailed study of the manufacturing data relating to the standard production cost of one product revealed the following:
1.Two pounds of materials are needed to produce one unit.
2.Standard unit cost of materials is $8 per pound.
3.It takes one hour of labor to produce one unit.
4.Standard labor rate is $10 per hour.
5.Standard overhead (all variable) for this volume is $4,000.
Each Case in E8-1 and E8-2 requires the following:
a.Set up a standard cost summary showing the standard unit cost
b.Analyze the variances for materials and labor.
c.Make journal entries to record the transfer to Work in Process of:
1.Materials Cost
2.Labor Cost
3.Overhead Costs
(When making these entries, include the variances.)
d.Prepare the journal entry to record the transfer of cost to the finished goods account.
E8-1 Standard unit cost; variance analysis; journal entries1,000 units were started and finished.
Case 1: All prices and quantities for the cost elements are standard, except for materials cost, which is $8.75per pound.
Case 2: All prices and quantities for the cost elements are standard, except that 1,800 lb of materials were used.
E8-2 Standard unit cost; variance analysis; journal entries 1000 units were started and finished.
Case 1: All prices and quantities are standard, except for the labor rate, which is $10.40per hour.
Case 2: All prices and quantities are standard, except for labor hours, which totaled 850.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started