Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

It is required to balance 300 sacks of Class G neat cement in 9% open hole by use of a 4%/2-in OD/3.92-in. ID, 13.5lb/ft tubing.

image text in transcribed
It is required to balance 300 sacks of Class G neat cement in 9% open hole by use of a 4%/2-in OD/3.92-in. ID, 13.5lb/ft tubing. The hole depth is 9,000ft and 25bbl of water is to be used as preflush ahead of the cement slurry. Calculate: 1. Total slurry volume, annular volume and tubing volume 2. Height of the balanced plug 3. Volume of water to be used as a spacer behind the cement 4. Volume of mud chase (or displacement volume) 5. Number of strokes required to displace cement to just below the drillpipe shoe, assuming that the pump capacity is 0.15bbl per stroke 6. Volume of cement and number of sacks required if the height of the plug is 500ft. It is required to balance 300 sacks of Class G neat cement in 9% open hole by use of a 4%/2-in OD/3.92-in. ID, 13.5lb/ft tubing. The hole depth is 9,000ft and 25bbl of water is to be used as preflush ahead of the cement slurry. Calculate: 1. Total slurry volume, annular volume and tubing volume 2. Height of the balanced plug 3. Volume of water to be used as a spacer behind the cement 4. Volume of mud chase (or displacement volume) 5. Number of strokes required to displace cement to just below the drillpipe shoe, assuming that the pump capacity is 0.15bbl per stroke 6. Volume of cement and number of sacks required if the height of the plug is 500ft

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Surfactant Enhanced Subsurface Remediation Emerging Technologies

Authors: David A. Sabatini, Robert C. Knox, Jeffrey H. Harwell

1st Edition

0841232253, 978-0841232259

More Books

Students also viewed these Chemical Engineering questions

Question

2. Competence management.

Answered: 1 week ago