Question
Jamesway Corporation makes two types of replacement fittings for heavy construction equipmentscrews and bolts. Data regarding the two products follow: Direct Labour-Hours per Unit Annual
Jamesway Corporation makes two types of replacement fittings for heavy construction equipmentscrews and bolts. Data regarding the two products follow:
Direct Labour-Hours per Unit | Annual Production | ||||
Screws | 0.20 | 40,000 | units | ||
Bolts | 0.10 | 60,000 | units | ||
Additional information about the company follows:
Screws require $8.95 in direct materials per unit, and bolts require $6.95.
The direct labour wage rate is $45 per hour.
Screws are more complex to manufacture than bolts, and they require special equipment.
The ABC system has the following activity cost pools:
Activity Cost Pool | Activity Measure | Estimated Overhead Cost | Activity | ||||||
Screws | Bolts | Total | |||||||
Machine setups | Number of setups | $ | 29,400 | 80 | 40 | 120 | |||
Special processing | Machine-hours | $ | 236,000 | 4,000 | 0 | 4,000 | |||
General factory | Direct labour-hours | $ | 609,000 | 7,000 | 14,000 | 21,000 | |||
Required:
1. Compute the activity rate for each activity cost pool.
2. Determine the unit cost of each product according to the ABC system, including direct materials and direct labour. (Round your answers to 2 decimal places.)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started