Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

JENT IM produces a range of proches Manufacturing is undertaken using one of two processes the de Processes All of the posts are manufactured in

image text in transcribed

JENT IM produces a range of proches Manufacturing is undertaken using one of two processes the de Processes All of the posts are manufactured in batches. The current pricing y has been so all overed wing direct labour hours to obtain total cost Rendeledysi as med overhead cost, the results are Any of overhead costs Cost per month (1) Monthly volume Alpha Processos 192.000 960 hours Onge Process cost $9.500 2,560 hours Set po 8.800 $20 set-ups Handling charges 91,200 180 movements Ohroverheads 101400 (see below) Teloverhead costs 560,000 Sert TechNyaritable cach month. w of KENT'S products are a IT101 and a GR27. Tils are produced by the Alpha Process in a imple operation GR 27s are manufactured by the Omega Process. Both products are sold by the metre of the fore products are: JT101 GR27 Monthly volume 1.000 metres 500 metres Ratch sie 1.000 metres 50 metres Processing time at batch Alpha 100 hours Omega 25 hours Set-ups per Match 1 set-up 2 set-ups Handling charges per batch I movement 5 movements Materials per metre 16 15 Direct labour permetre (Direct cost) bour hour irect labour is paid at 16 per hour. 2. Calculate the total cost per metre for both JT101s and GR27s detailed above, using raditional costing based on direct labour hours. respectively 303 & 304 respectively 136 & 164 respectively 311 & 312 respectively 171 & 172 O JENT IM produces a range of proches Manufacturing is undertaken using one of two processes the de Processes All of the posts are manufactured in batches. The current pricing y has been so all overed wing direct labour hours to obtain total cost Rendeledysi as med overhead cost, the results are Any of overhead costs Cost per month (1) Monthly volume Alpha Processos 192.000 960 hours Onge Process cost $9.500 2,560 hours Set po 8.800 $20 set-ups Handling charges 91,200 180 movements Ohroverheads 101400 (see below) Teloverhead costs 560,000 Sert TechNyaritable cach month. w of KENT'S products are a IT101 and a GR27. Tils are produced by the Alpha Process in a imple operation GR 27s are manufactured by the Omega Process. Both products are sold by the metre of the fore products are: JT101 GR27 Monthly volume 1.000 metres 500 metres Ratch sie 1.000 metres 50 metres Processing time at batch Alpha 100 hours Omega 25 hours Set-ups per Match 1 set-up 2 set-ups Handling charges per batch I movement 5 movements Materials per metre 16 15 Direct labour permetre (Direct cost) bour hour irect labour is paid at 16 per hour. 2. Calculate the total cost per metre for both JT101s and GR27s detailed above, using raditional costing based on direct labour hours. respectively 303 & 304 respectively 136 & 164 respectively 311 & 312 respectively 171 & 172 O

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Accounting And Finance For Non Specialists

Authors: Peter Atrill, Eddie McLaney

12th Edition

129233469X, 9781292334691

More Books

Students also viewed these Accounting questions