JITlean system uses kanban cards to authorize production and movement of materials. In one portion of the system, a work centre ses an average of pieces of a part per hour. The manager has assigned a safety factor of Standard containers are designed hold five dozen pieces each. The cycle time for a kanban is minutes.
low many kanbans are needed? Round the final answer to the nearest whole number.