Question
Johnson Electronics manufactures a power supply used in a variety of electronics products, including printers, modems, and routers. The demand for the part is 7,400
Johnson Electronics manufactures a power supply used in a variety of electronics products, including printers, modems, and routers. The demand for the part is 7,400 units per week. The production of the power supply requires six different manufacturing operations, each in sequence and each having the following processing times. The net available time to work is 45 hours per week, using two shifts.
Operation | Processing Time (seconds) | ||
Operation 1 | 18 | ||
Operation 2 | 15 | ||
Operation 3 | 22 | ||
Operation 4 | 17 | ||
Operation 5 | 27 | ||
Operation 6 | 21 | ||
Required:
1. What is the Takt time, in seconds, for this product? (Round your final answer to the nearest whole number.)
2. Is the processing line properly balanced for this product?
-
Yes
-
No
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started