Just fill out whats its seen in second screenshot using CPOF methodology. Manufacturing Lead times Level O leadtime = 0 (that is, these operations occur

image text in transcribedimage text in transcribed

Just fill out whats its seen in second screenshot using CPOF methodology.

Manufacturing Lead times Level O leadtime = 0 (that is, these operations occur in the same period as gross requirements) Level 1 Leadtime = 1 (these operations occur one week prior to level O operations) Level 2 leadtime=1 (i.e. these operations occur 1 week prior to level 1 operations) 800 A company makes 2 products (Backboard post set and Volleyball post set) which is manufactured in house. Given the following information, prepare a rough-cut analysis of capacity (using CPOF and capacity bills) for next 4 weeks based on the MPS, and determine when and which areas are out of capacity. A. Products Backboard post set + F. Routings and time Standards (hours/unit) Volleyball post set Package backboard post set hrs/unit Assembly 0.1 B. Plant Work Centers Capacities (in terms of employees and hrs) Manufacture upright 001- Sawing 12 @ 40 hrs 002- Bending 20 @ 40 hrs Bending 0.2 003- Drilling 5 @ 40 hrs Welding 0.1 004- Milling 5 @ 40 hrs Manufacture Crossbar 005- Welding 10 @ 40 hrs Welding 0.1 006- Assembly 5 @ 40 hours Manufacturing shaft C. Master Production Schedule Sawing 0.1 Product WK1 WK 2 WK 3 WK4 Bending 0.2 Backboard post sets 1000 1200 800 Welding 0.1 Volleyball post sets 800 600 600 1000 Sawing 0.2 D. Historical Work Center Percentage Manufacture plate next to post 001- Sawing 20% Sawing 002- Bending Drilling 0.1 003- Drilling 10% Manufacture plate next to backboard 004- Milling 10% Sawing 0.1 005- Welding 20% 006- Assembly 10% Milling 0.2 Package backboard post hardware E. Manufacturing Bill of Materials (excluding raw materials) Assembly 0.05 **Standard hours per blackboard 1.6 hours ** Backboard post set (package) Package volleyball post set Upright (manufacture) Assembly 0.1 Crossbar (weld on plates) Manufacture posts (each package requires two posts) Shaft (manufacture) Bending 0.2 Plate next to post (manufacture) Welding 0.1 Manufacture plate next to backboard Hardware package (package) Drilling 0.05 Package volleyball post hardware Volleyball post set (package) Assembly 0.05 Posts (manufacture) **Standard hours per volleyball post set 0.85 hours** Hardware package (package) 0.05 30% hrs/unit 0.1 Using CPOF Package backboard post set Assembly Manufacture upright Bending Welding Manufacture Crossbar Idea: Calculate capacity requirements for overall plant and divide in to work centers using historical percentage 0.2 0.1 Package volleyball post set Assembly 0.1 Manufacture posts (each package requires two posts) Bending 0.2 Welding 0.1 Drilling 0.05 Package volleyball post hardware Assembly 0.05 **Standard hours per volleyball post set 0.85 hours Welding 0.1 WK4 800 Step 1: Capacity Requirements Computations : Product WK1 WK 2 WK 3 Backboard post sets 1000 1200 800 Volleyball post sets 800 600 600 Std Time 1.6 Manufacturing shaft Sawing 0.1 1000 0.85 0.2 0.1 Total 0.2 WK 3 WK4 Bending Welding Sawing Manufacture plate next to post Sawing Sawing Drilling Manufacture plate next to backboard Sawing Milling Package backboard post hardware 0.05 0.1 0.1 Step 2: Allocation using historical percentages Work Center Percentage WK1 WK 2 Sawing 20 Bending 30 SU Drilling 10 Milling 10 Welding 10 Assembly 10 Check 0.2 Assembly 0.05 **Standard hours per blackboard 1.6 hours Answer to question - determine when and which areas are out of capacity? ? Work Center Task Capacit Y per week 1 2 3 4 5 6 Sawing Bending Drilling Milling Welding Assembly Manufacturing Lead times Level O leadtime = 0 (that is, these operations occur in the same period as gross requirements) Level 1 Leadtime = 1 (these operations occur one week prior to level O operations) Level 2 leadtime=1 (i.e. these operations occur 1 week prior to level 1 operations) 800 A company makes 2 products (Backboard post set and Volleyball post set) which is manufactured in house. Given the following information, prepare a rough-cut analysis of capacity (using CPOF and capacity bills) for next 4 weeks based on the MPS, and determine when and which areas are out of capacity. A. Products Backboard post set + F. Routings and time Standards (hours/unit) Volleyball post set Package backboard post set hrs/unit Assembly 0.1 B. Plant Work Centers Capacities (in terms of employees and hrs) Manufacture upright 001- Sawing 12 @ 40 hrs 002- Bending 20 @ 40 hrs Bending 0.2 003- Drilling 5 @ 40 hrs Welding 0.1 004- Milling 5 @ 40 hrs Manufacture Crossbar 005- Welding 10 @ 40 hrs Welding 0.1 006- Assembly 5 @ 40 hours Manufacturing shaft C. Master Production Schedule Sawing 0.1 Product WK1 WK 2 WK 3 WK4 Bending 0.2 Backboard post sets 1000 1200 800 Welding 0.1 Volleyball post sets 800 600 600 1000 Sawing 0.2 D. Historical Work Center Percentage Manufacture plate next to post 001- Sawing 20% Sawing 002- Bending Drilling 0.1 003- Drilling 10% Manufacture plate next to backboard 004- Milling 10% Sawing 0.1 005- Welding 20% 006- Assembly 10% Milling 0.2 Package backboard post hardware E. Manufacturing Bill of Materials (excluding raw materials) Assembly 0.05 **Standard hours per blackboard 1.6 hours ** Backboard post set (package) Package volleyball post set Upright (manufacture) Assembly 0.1 Crossbar (weld on plates) Manufacture posts (each package requires two posts) Shaft (manufacture) Bending 0.2 Plate next to post (manufacture) Welding 0.1 Manufacture plate next to backboard Hardware package (package) Drilling 0.05 Package volleyball post hardware Volleyball post set (package) Assembly 0.05 Posts (manufacture) **Standard hours per volleyball post set 0.85 hours** Hardware package (package) 0.05 30% hrs/unit 0.1 Using CPOF Package backboard post set Assembly Manufacture upright Bending Welding Manufacture Crossbar Idea: Calculate capacity requirements for overall plant and divide in to work centers using historical percentage 0.2 0.1 Package volleyball post set Assembly 0.1 Manufacture posts (each package requires two posts) Bending 0.2 Welding 0.1 Drilling 0.05 Package volleyball post hardware Assembly 0.05 **Standard hours per volleyball post set 0.85 hours Welding 0.1 WK4 800 Step 1: Capacity Requirements Computations : Product WK1 WK 2 WK 3 Backboard post sets 1000 1200 800 Volleyball post sets 800 600 600 Std Time 1.6 Manufacturing shaft Sawing 0.1 1000 0.85 0.2 0.1 Total 0.2 WK 3 WK4 Bending Welding Sawing Manufacture plate next to post Sawing Sawing Drilling Manufacture plate next to backboard Sawing Milling Package backboard post hardware 0.05 0.1 0.1 Step 2: Allocation using historical percentages Work Center Percentage WK1 WK 2 Sawing 20 Bending 30 SU Drilling 10 Milling 10 Welding 10 Assembly 10 Check 0.2 Assembly 0.05 **Standard hours per blackboard 1.6 hours Answer to question - determine when and which areas are out of capacity? ? Work Center Task Capacit Y per week 1 2 3 4 5 6 Sawing Bending Drilling Milling Welding Assembly

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Global Financial Accounting And Reporting Principles And Analysis

Authors: Peter Walton, Walter Aerts

4th Edition

1473729521, 9781473729520

More Books

Students also viewed these Accounting questions

Question

OUTCOME 6 Explain and give examples of diversity management.

Answered: 1 week ago