Question
JUST THE ANSWER NO NEED FOR EXPLANATION QUESTION 21 1. The following is not a typical characteristic of an Executive Information System: A. used primarily
JUST THE ANSWER NO NEED FOR EXPLANATION
QUESTION 21 1. The following is not a typical characteristic of an Executive Information System:
A. used primarily for tracking and control
B. requires the assistance of intermediaries
C. graph
D. easy to use
QUESTION 22 1. Artificial Intelligence includes all these areas, except:
A. Geographic Information Systems
B. Natural Languages
C. Perceptual Systems
D. Expert Systems
QUESTION 23 1. The main method of access control between the organization and the Internet is called:
A. "firewall"
B. encrypt
C. shutting down Internet access
D. none of the above
QUESTION 24 1. The intangible benefits of a proposed information system are:
A. easy to quantify
B. difficult to quantify
C. specified in the requirements definition
D. specified in the system design
QUESTION 25 1. Identify what is considered a tactic to boycott an Information Systems project:
A. cause you arrears
B. add complexity
C. remove resources
D. all of the above
QUESTION 26 1. In a Payroll system, check printing and the Overtime Report are examples of the following system element:
A. "output"
B. "input"
C. storage
D. memory
QUESTION 27 1. The Development Life Cycle of an "SDLC" System consists of the following three phases:
A. requirements, design and implementation
B. definition, construction and implementation
C. specifications, development and installation
D. feasibility analysis, testing and maintenance
QUESTION 28 1. The conversion strategy for the implementation of an Information Systems project where the new system is implemented in part of the organization and after the necessary tests it is implemented in the rest of the organization, is known as:
A. parallel
B. by phases
C. "cutover" or direct
D. pilot project
QUESTION 29 1. The programming tools that automate some or all phases of the Development Life Cycle of an "SDLC" System are called:
A. RAD
B. JAD
C. CASE
D. DRS
QUESTION 30 1. The conversion strategy for the implementation of an Information Systems project where the new system is implemented while the old one is in operation (until the new system is debugged), is known as:
A. parallel
B. pilot project
C. by phases
D. "cutover" or direct
QUESTION 31 1. The characteristic that best describes the "cutover" or direct conversion strategy is:
A. safe
B. stable
C. risky
D. none of the above
QUESTION 32 1. In the Development Life Cycle of an "SDLC" System, the testing stage is part of the phase of:
A. maintenance
B. construction
C. implantation
D. installation
QUESTION 33 1. The conversion strategy for the implementation of an Information Systems project where the old system is discarded giving way to the new system, is known as:
A. parallel
B. by phases
C. pilot project
D. "cutover" or direct
QUESTION 34 1. RAD, a methodology that combines prototypes with "Joint Application Design" (JAD) and integrated "I-CASE" tools to rapidly produce high-quality systems, means
: A. "Reengineered Advanced Development"
B. "Rapid Analytical Design"
C. "Reengineered Application Design"
D. "Rapid Application Development"
QUESTION 35 1. Which component belongs to project planning?
A. "project scheduling"
B. "project budgeting"
C. "project staffing"
D. All of the above.
JUST THE ANSWER NO NEED FOR EXPLANATION
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started