Keeran Corporation estimates that its variable manufacturing overhead is $5.20 per machine-hour and its fixed manufacturing overhead is $242,048 per period. If the denominator level
Keeran Corporation estimates that its variable manufacturing overhead is $5.20 per machine-hour and its fixed manufacturing overhead is $242,048 per period.
If the denominator level of activity is 6,100 machine-hours, the predetermined overhead rate would be:
Multiple Choice
-
$5.20 per machine-hour
-
$44.24 per machine-hour
-
$44.88 per machine-hour
-
$39.68 per machine-hour