KEWL Short Line Railroad ( Rail Link ) Off - Site Terminal Project The demand for air cargo tenants is larger than we initially
KEWL Short Line Railroad Rail Link" OffSite Terminal Project
The demand for air cargo tenants is larger than we initially expected. To accommodate additional need for cargo terminal capacity, the KEWL RailLink Development Corp. has developed a proposal to submit to IDOT, the Federal Railroad Administration, to build a shortline railroad across two phases between the airport cargo terminals and an existing, but underutilized offsite distribution center. A previous study has indicated that it would be much less costly to build a segment of rail and acquire rolling stock than to construct a third andor fourth terminal building on the northside of equivalent capacity. An alignment for the proposed KEWL Rail Link has been developed and we are looking to your firm to evaluate these plans before the proposal is circulated among the current committed airlines, railroad operators, and distribution center owners. This includes answering the following:
Overall Proposal Review: Review the concept available on the KEWL website and comment on the viability of this project. Short Line Railroad Rail Link" OffSite Terminal Project: The demand for air cargo tenants is larger than we initially expected. To accommodate additional need for cargo terminal capacity, the KEWL RailLink Development Corp. has developed a proposal to submit to IDOT, the Federal Railroad Administration, to build a shortline railroad across two phases between the airport cargo terminals and an existing, but underutilized offsite distribution center. A previous study has indicated that it would be much less costly to build a segment of rail and acquire rolling stock than to construct a third andor fourth terminal building on the northside of equivalent capacity. An alignment for the proposed KEWL Rail Link has been developed and we are looking to your firm to evaluate these plans before the proposal is circulated among the current committed airlines, railroad operators, and distribution center owners.
Review the concept available on the KEWL website and consider the following:
Rail Rolling Stock: Currently, only one locomotive and a set of boxcar rolling stock would be available to be used for trips to and from the airport cargo terminals. A specially designed ULDcontainer car is in prototype stages would not be ready when the airport is set to open to tenants.
Porject Phases:
Phase A: Shuttling cargo from aircraft via rail using only the centerdoor boxcars;
Phase B: Developing the ULD Container cars and using them for operations;
Phase : Building the additional connection to the south side terminals, including installing a reinforced gradecrossing for truck movements in and out of the complex and connections to nearby warehouses at the CIC JolietElwood facilities.
What recommendation would you give for each phase of this project and what did you consider for each recommendation?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started