Question
Kovack Construction estimated its factory overhead for 2021 to be $150,000. It assigns overhead to jobs based on the direct labor cost of a job.
Kovack Construction estimated its factory overhead for 2021 to be $150,000. It assigns overhead to jobs based on the direct labor cost of a job. The estimated total direct labor cost for 2021 was $93,750. | ||||
One of the jobs worked on in January 2021 was for Hillier Chemicals. The Hillier job required $1,900 of | ||||
direct materials and incurred $8,300 of direct labor costs. | ||||
REQUIRED: (SHOW CALCULATIONS) | ||||
a) Calculate the predetermined overhead rate for 2021. | ||||
b) Calculate the amount of overhead to assign to the Hillier job. | ||||
c) Show a calculation to determine the total cost of the Hillier job. |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started