l7. A load of weight 1000 N is transferred from A to B by a ropeway as shown. The load moves at a constant speed
l7. A load of weight 1000 N is transferred from A to B by a ropeway as shown. The load moves at a constant speed of 0.5 m s". Find the work done on the load when it is transferred from A to B. A. 15 000 J B. 25 000 J C. 50 000 J D. 147 000 J