Question
LaRosa Machine Shop (LMS) is studying where to locate its tool bin facility on the shop floor. The locations of the five production stations appear
LaRosa Machine Shop (LMS) is studying where to locate its tool bin facility on the shop floor. The locations of the five production stations appear in figure shown below.
Click on the datafile logo to reference the data.
Location
Station X Y Demand
Fabrication 1.0 4.0 12
Paint 1.0 2.0 24
Subassembly (1) 2.5 2.0 13
Subassembly (2) 3.0 5.0 7
Assembly 4.0 4.0 17
In an attempt to be fair to the workers in each of the production stations, management has decided to try to find the position of the tool bin that would minimize the sum of the distances from the tool bin to the five production stations. We define the following decision variables:
X = horizontal location of the tool bin
Y = vertical location of the tool bin
We may measure the straight line distance from a station to the tool bin located at (X,Y) by using Euclidean (straight-line) distance. For example, the distance from fabrication located at the coordinates (1,4) to the tool bin located at the coordinates (X,Y) is given by .
Solve the model developed If required, round your answer to three decimal places.
x= (_____________)
Y=(_____________)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started