leaming curve means \\( b=-0.152004 \\).) (Cick the icon to vew the cost information). Finad the requirements. for potertal customen.) Bingin by determining the hours used to produce the six PT109s for the Nayy. (Round your anewers to the nearest whele number.) The solal cumulative time in fabarthoun for srven PT109s is PTions is hours. hours: therefore, the latal time lo ptoduce six deployment boats. The Navy is impressod with the PT 109. It requests that WLJ Boat submit a proposal on the cost of producing another six PT 109s. WLJ Boat reports the fol ormation for the first PT 109 assembled and uses a \90 cumulative average-fime learring model as a basis for forocasting direct manufacturing labor-hours for the next six P ming curve means \\( b=-0,152004 \\).) Data table Direct materials cost Direct manufacturing labor time for first boat Learning curve for manufacturing labor time per boat Direct manufacturing labor costs Variable manufacturing overhead costs Other manufacturing overhead Tooling costs? \\$ 205,000 per PT 109 15,200 direct manufacturing labor-hours 90\\% cumulativo average time' s 45 per direct manufacturing labor hour 21 per direct manufacturing labor-hour \25 of divect manulacturing tabor costs s. 285,000 1. Using the formula for a \90 learning curve, \\( b=\\frac{\\ln 0.90}{\\ln 2}=\\frac{-0.105361}{0.693147}=-0.152004 \\) 2 Tooling can be reused at no extra cast because all of its cost has been assigned to the first deployment boat ve means \\( b=-0.152004 \\). icon to view the cost information.) guirements. Requirements 1. Calculate predicted total costs of producing the six PT109s for the Navy. (WLJ Boat will keep the first deployment boat assembled, costed at \\( \\$ 1,493,200 \\), as a demonstration model for potential customers.) 2. What is the dollar amount of the difference botween (a) the predicted total costs for producing the six PT109s in requirement 1, and (b) the predicted total costs for producing the six PT 109s, assuming that there is no learning curve for direct manufacturing labor? That is, for (b) assume a linear function for units produced and direct manufacturing labor-hours. nt boat assembled, costed at \\( \\$ 1,493,2 \\mathrm{C} \\) 7.)