Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Leisure Chairs is a small manufacturer of two types of popular leisure chairs, the SlingChairs and the Adirondack models. The manufacturing process consists of two

image text in transcribed
Leisure Chairs is a small manufacturer of two types of popular leisure chairs, the SlingChairs and the Adirondack models. The manufacturing process consists of two departments: fabrication and finishing. The fabrication department has 10 skilled workers, each of whom works 8 hours per day. The finishing department has 5 workers, each of whom works a 8-hour shift per day. Each pair of SlingChairs requires 3.5 labor hours in the fabrication department and 2 labor hours in finishing. The Adirondack model requires 4.5 labor-hours in fabrication and 3.5 labor-hours in finishing. The company operates 6 days a week. It makes a per unit profit of $57 on the SlingChair model and $68 on the Adirondack model The company anticipates selling at least twice as many Adirondack models as SlingChairs models. The company is developing a monthly production plan and wants to know how many surfboards of each kind should be produced in every month (4 week period). An intern working at company was asked to develop a spreadsheet model. (Help the intern formulate and work with the model). When solved the optimization model resulted in following outcome Decision Variables SlingChairs (S) |Adirondack (A) 106.7 213.3 ANSWER B Indicate A/B/C/D In this problem intern 1 . must have formulated A. -25 + 1A = D. none of the Market mix C. 25+ 1A=0 these constraint as: What will be the profit 2. contribution from A. 11.00 B. 253.33 C. 1520.00 D. 6080.00 SlingChairs? What will be the profit 3. contribution from A. 11.00 B. 14506.67 |C. 604.44 D. 3626.67 Adirondack chairs? What is the total profit A. 125.00 B. 857.78 C. 5146.67 D. generated? 20586.67 What is the total 5. number of hours A. 8 available for B. 1920 C. 80 D. 480 fabrication operation? What is the total number of hours 6. A. 8 B. 960 C. 240 D. 40 available for th nishing operation? What is the total number of hours used for fabrication A. 960 B. 333.33 C. 55.56 D. 1333.33 operation? What is the total 8. number of hours used A. 960 B. 5.5 C. 240 D. 180 for the finishing operation? What is the value of 9. slack? A. 586.67 B. 24.44 C. 72 D. 480 If Leisure Chairs is hiring anothe 10. employee, based on A. C. D. Do not your analysis, which Marketing B. Finishing Fabrication hire department should it hire for

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Quantitative Analysis For Management

Authors: Barry Render, Ralph M. Stair, Michael E. Hanna

11th Edition

9780132997621, 132149117, 132997622, 978-0132149112

Students also viewed these Mathematics questions

Question

. Buy a home and pay it off.

Answered: 1 week ago