Let me know if any additional information is needed: Company X needs greater storage capacity to maintain production flow and is considering an ASRS. The

Let me know if any additional information is needed:image text in transcribed

Company X needs greater storage capacity to maintain production flow and is considering an ASRS. The limits of the building and the product will allow for ASRS racks that are 200 feet horizontal and 50 feet vertical. The number of aisles in the ASRS is flexible and is what needs to be determined. The average horizontal speed of the S/R is 300 feet per minute (fpm) and the average vertical speed is 50 fpm. The shuttle requires 15 seconds to perform a pick up or drop off operation. Assume one S/R machine per aisle. The goal is a system to perform during peak times with 100 storages per hour and 150 retrievals per hour. The assumption is that all storages will be able to be matched with a retrieval on a Dual Command cycle. A. What is the expected cycle time for a single command cycle? (5 pts) B. What is the expected cycle time for a dual command cycle? (5 pts) C. What is the minimum number of S/R machines (aisles) necessary to meet the demand? (5 pts) D. They would like to keep the machines at 80% or less utilization to allow time for repairs and maintenance. How many S/R machines are needed now for this scenario? (5 pts) Company X needs greater storage capacity to maintain production flow and is considering an ASRS. The limits of the building and the product will allow for ASRS racks that are 200 feet horizontal and 50 feet vertical. The number of aisles in the ASRS is flexible and is what needs to be determined. The average horizontal speed of the S/R is 300 feet per minute (fpm) and the average vertical speed is 50 fpm. The shuttle requires 15 seconds to perform a pick up or drop off operation. Assume one S/R machine per aisle. The goal is a system to perform during peak times with 100 storages per hour and 150 retrievals per hour. The assumption is that all storages will be able to be matched with a retrieval on a Dual Command cycle. A. What is the expected cycle time for a single command cycle? (5 pts) B. What is the expected cycle time for a dual command cycle? (5 pts) C. What is the minimum number of S/R machines (aisles) necessary to meet the demand? (5 pts) D. They would like to keep the machines at 80% or less utilization to allow time for repairs and maintenance. How many S/R machines are needed now for this scenario? (5 pts)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Managefirst Managerial Accounting With Pencil/Paper Exam

Authors: National Restaurant Association

1st Edition

0132283417, 978-0132283410

More Books

Students also viewed these Accounting questions

Question

3 . What is meant by the term intake? CJ 2 0 1 9 James A . Fagin

Answered: 1 week ago

Question

Conduct a needs assessment. page 269

Answered: 1 week ago