Answered step by step
Verified Expert Solution
Link Copied!

Question

00
1 Approved Answer

London Company's Forest City Plant produces precast ingots for industrial use. Anne-Marie Gosnell, who was recently appointed general manager of the Forest City Plant, has

image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
London Company's Forest City Plant produces precast ingots for industrial use. Anne-Marie Gosnell, who was recently appointed general manager of the Forest City Plant, has just been handed the plant's income statement for October. The statement is shown below. Gosnell was shocked to see the poor results for the month, particularly since sales were exactly as budgeted. She stated, *1 sure hope the plant has a standard costing system in operation. If it doesn't, I won't have the slightest idea of where to start looking for the problem." Budgeted Actual $125,000 $125,000 Sales (2,500 ingots) Variable expenses Variable cost of goods sold Variable selling expenses Total variable expenses Contribution margin Fixed expenses Manufacturing overhead Selling and administrative Total fixed expenses Operating income (loss) 40,000 10.000 50,000 75,000 45,455 10,000 55,455 69.545 30,000 29,500 37.500 37.500 67,500 67,000 $7.500 2,545 *Contains direct materials, direct labour, and variable manufacturing overhead. The plant uses a standard costing system, with the standard variable cost per ingot details shown below Standard Quantity or Moure 2.0 xilograme 0.54 hour 0.27 hour Direct materials Direet labour Variable manufacturing overhead Total standard variable cost Standard Coat 52.50 5.40 Standard Price or Kate 5 1.25 per kilogram 510.00 per hour $ 1.00 per hour $8.17 Based on machine-hours. in rosts U Vaiiauie cost per ingot details shown below. Direct materials Direct labour Variable manufacturing overhead Total standard variable coat Standard Quantity or Hours 2.0 kilograms 0.54 hours 0.27 hours Standard Price or late $ 1.25 per kilogram $10.00 per hour $ 1.00 per hour Standard Coat $2.50 5.40 0.27 $8.17 "Based on machine-hours. Gosnell has determined that during October the plant produced 2.500 ingots and incurred the following costs: a. Purchased 6,300 kilograms of materials at a cost of $1.50 per kilogram. There were no raw materials in inventory at the beginning of the month b. Used 4,900 kilograms of materials in production (Finished goods and work in process inventories are insignificant and can be ignored.) c Worked 1,800 direct labour-hours at a cost of $9.50 per hour. d. Incurred a total variable manufacturing overhead cost of $1,080 for the month. A total of 900 machine hours were recorded. It is the company's policy to close all variances to cost of goods sold on a monthly basis. Required: 1. Compute the following variances for October a. Direct materiais price and quantity variances. (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (e. rere variance). Material price variance Material quantity variance b. Direct labour rate and efficiency variances. (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (.e., zero variance).) Labour rate variance Labour efficiency variance c. Variable manufacturing overhead spending and efficiency variances. (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance).) Variable overhead spending verande Variable overhead efficiency variance 2-a. Summarize the variances that you computed in requirement 1 above by showing the net overall favourable or unfavourable variance for October. (Indicate the effect of each variance by selecting "for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance).) Net variance 2-b. What impact did net variance figure have on the company's income statement? This will cause the Cont of Goods Sold to 3-a. Pick out the two most significant variances that you computed in requirement (1) above. (Select all that apply) UDON Materials price variance Materials quantity variance Labour rate variance Variable overhead efficiency variance Variable overhead spending variance Labour officiency variance

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions