make sure answers are correct and complete all parts please
Her operations manager is considering a new plan, which begins in January with 200 unts of inventory on hand Stockout cost of lost sales is 570 per unt imenory holding coat is $25 per unt per month. Igncee any idle-time costs. Evaluate the folowing plans D and E Plan D- Keep the current worblorce stable at producing 1,600 unts per month in addition to the regular production, anothes 20% of the normal production units can be preduced in overime at an additional oost of $55 per unt. A warehouse now consinains the maximum allowable inventory on hand to 600 unds or less Note: Do not preduce in evertime d production or inventory ace adoquise to comer demand The total overtime production cost i $ (Enter your response as a whole number) The total overt me production cost is : (Enter your response as a wholo number) The total inventory holding cost for January through August = (Enter your response as a whole number) The total stockoul cost =$ (Enter your response as a whale number) The tocal cost, excluding normal time labor costs, for Plan D=5 (Enter your nesponse as a whole number) 600 unis per month. The warehouse and evertime contvants from Pian D do not apply to tis plan The total inventory holding cost for January through August =$ (Enter your rosponse as a whale number) The total stockout cost m is (Enter your rosponse as a whole number.) The total cost, exeluding normal time labor costs, for Plan D=5 (Enter your response as a whole number) Plan E. Keep the current workforce, which is producing 1.600 units per month, and subcontract to meet the rent of the domand Subcontract cost is $30 per uni Subcontracting capacty is imized ic 600 units per month. The warehouse and overtime constraints trom Plan D do not apply to this plan. The total subcontracting cost =1 (nter your response as a whole number) The total inventory holding cost for January through August is 5 (Entor your response as a whole number) The total cost, excluding normal time labor costs, for Plan E=4 (Enter your rosponse as a whole number)