Make sure you fill in all Yellow cells. Yellow cells left blank will receive zero credit. Problem CW Corporation manufactures travel docks and watches Overhead coare currently allocated in direct labor hours, but the controller hos recommended using an activity based costing stem based on the following data: 21 points Watches Contiver Setups Cost Aulened 5 Travel Clocks 20 Activity Products Matranding PS Total Overhead Urhed 100.000 0.000 60.000 190,000 16 parts 120 000 units 30,000 units 5 Problem D al Compute the amount of total overhead located to each of the products under activity based costing Stale Activity Rates today! Over Whou THE OH Costassigned $100.000 Activity Production et 2 Handling Packaging and shops Total Activity 50 s parts units shipped Activity Mate Predetermined. OH Ratel 52.000 perp er at per unit shippet S100.000 2. Alcatel sach production done for you Travel Clocks 40.000 Watches 60,000 Www Production Setup Matanal Handling ang Total Overhead 10,000 5 50,000 Total Overhead applied 5 100 000 3) Compute the amount of total overhead allocated to each product in the POHR with bor hurt the location base 14 Aumered to be wash unitare 0.5 per travel stock and 1 perwach, and that 80.000 brelocks and 120.000 witches were grad cand watch Total Activity SO seu parts units shipped Activity Rate Predetermined OH Ratel) $2.000 per setup per part TH La |t v HIV/ Stop L Calculate Act Rated to done for you 12 Activity OH Corted Production Setup $100,000 30 Material Handing Packaging and Shipping 22 $100,000 23 22 Alcate owerhead to the product that one done for you 20 Travel Clocks 3 Production Setup 40.000 Material landing canand Shipper 30 Total Overhead 40,000 Watches 60.000 . 60.000 money Total Overhead applied 5 100,000 11 31 1D Compute the amount of total overhead allocated to each product using the POHR with tabor hours as the allocation base Anumelaber-hour required to assemble each unitare 0.3 per travel deck and 1.0 per watch, and that 10,000 travel clocks and 120,000 watches were produced Step Li Calculate the pretermined Owerhead POHRANA Tot croect Labor Hourse the allocation be total warhead per OL hour Total Director hon in Detroud Stopa Calculate must direct lahore Units Producer Labor House Total direct labot hun Travel perdo Watches per watch O Total Direct Labor tours 41 Opwed the Pradetermined Overhease (POHA) tove Travel Clocka Watches Total Overhead applied COM In or 14 55