Question
At a hydrocarbon processing factory, process control involves periodic analysis of samples for a certain process quality parameter. The analytic procedure currently used is costly
At a hydrocarbon processing factory, process control involves periodic analysis of samples for a certain process quality parameter. The analytic procedure currently used is costly and time consuming. A faster and more economical alternative procedure has been proposed. However, the numbers for the quality parameter given by the alternative procedure are somewhat different from those given by the current procedure, not because of any inherent errors but because of changes in the nature of the chemical analysis.
Management believes that if the numbers from the new procedure can be used to forecast reliably the corresponding numbers from the current procedure, switching to the new procedure would be reasonable and cost effective. The following data were obtained for the quality parameter by analyzing samples using both procedures:
Current (Y) | Proposed (X) | Current (Y) | Proposed (X) |
2.6 | 3.0 | 3.1 | 3.1 |
3.4 | 4.0 | 2.9 | 2.8 |
3.1 | 3.5 | 3.3 | 3.6 |
3.6 | 4.0 | 3.4 | 4.2 |
3.6 | 3.5 | 2.1 | 2.6 |
2.7 | 3.6 | 2.8 | 3.2 |
2.9 | 3.5 | 3.1 | 2.7 |
Use linear regression to find a relation to forecast Y, which is the quality parameter from the current procedure, using the values from the proposed procedure, X.
The forecasting model is given by the equation
Y=_____+_______X.
Step by Step Solution
3.37 Rating (163 Votes )
There are 3 Steps involved in it
Step: 1
Image caption The linear equat...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started