Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Many of todays digital or electronic devices and equipment cannot function without the use of a highly complex interconnected network of generally microscopic electronic components.

Many of todays digital or electronic devices and equipment cannot function without the use of a highly complex interconnected network of generally microscopic electronic components. Nano Semicon is one of the leading contract manufacturer of integrated circuits (or IC chips) manufacturer in the region. The worldwide shortage of these IC chips has put pressure on IC chip manufacturers ever increasing demands. Nano Semicon currently manages to cope with this upsurge in IC chips consumption. Nano Semicon has already converted much of its manufacturing facility into a highly automated factory, employing robotics and artificial intelligence to handle most of the repetitive tasks. However, the factory still needs some workers to be working in shifts such as process engineers, technical personnel, software programmers and quality control inspectors. The factory works on a 24/7 five-shift basis. The full cycle of operations starts at 7am (or 0700) and ends at 7am the next day. This cycle is divided into 9 periods, each consisting of a two-hour duration. For example, the first two-hour period of the cycle lasts from 0700 to 0900. The details of the breakdown of the time periods as well as the minimum number of workers required per time period are given in Table 1 below. As workers per shift are given different tasks to perform, their wages per worker varies from shift to shift. The Production Manager, together with the Human Resource Manager had worked out the cost per worker per shift. These are also given in Table 1 below. The Triangle symbols in Table 1 indicate the number of time periods that each shift of workers must work. For example, Shift 1 workers are required to work from 0700 to 1500. (Time includes lunch of 30 minutes at 12.30pm).

image text in transcribed

Referring to any constraint with a non-zero Shadow Price in your Sensitivity Report, explain the term Shadow Price. Illustrate using an example from your Sensitivity Report how a non-zero Shadow Price works and state the condition(s) under which it can be applied. (Explanation = 3 marks) (Illustration of Shadow Price = 6 marks) (Condition for application = 3 marks)

Time Period Shift 3 1 2 4 5 A A A DIDIDID DDDD A 0700 - 0900 0900 - 1100 1100 - 1300 1300 - 1500 1500 - 1700 1700 - 1900 1900 - 2100 2100 - 2300 2300 - 0700 Wage per worker A Minimum number of Workers Required 32 70 62 55 65 62 70 35 15 DDDD A A DIDID A A A 62 55 52 53 58 Table 1: Shift vs Time period

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

An Audit Of Police Oversight In Africa

Authors: African Police Oversight Forum

1st Edition

1920299173, 978-1920299170

More Books

Students also viewed these Accounting questions

Question

What accounts are affected when bonds are issued at face value?

Answered: 1 week ago

Question

Which are non projected Teaching aids in advance learning system?

Answered: 1 week ago