Maryville Manufacturing designs and builds custom mudroom storage benches.All of the mudroom storage benches are constructed with rustic hickory.Its budgeted manufacturing costs for the 2018
Maryville Manufacturing designs and builds custom mudroom storage benches.All of the mudroom storage benches are constructed with rustic hickory.Its budgeted manufacturing costs for the 2018 year are as follows.
Overhead cost pools
Purchasing | $45,000
Handling Materials | $50,000
Production | $130,000
machine setup | $85,000
Inspecting | $60,000
Inventory control | $80,000
Utilities | $100,000
Total budgeted overhead costs |$550,000
For the last 5 years, Maryville Manufacturing has been charging overhead to products on the basis of materials cost.For the year 2018, materials cost of $500,000 were budgeted.
Jim Johnson, owner-manager of Maryville Manufacturing, recently directed his accountant, Ledger Kaufman, to implement the activity-based costing system that he has repeatedly proposed.At Jim's request, Ledger and the production foreman identify the following cost drivers and their usage for the previously budgeted overhead cost pools.
Overhead Cost Pools |Activity Cost Drivers|Expected Use of Drivers
Purchasing|# of orders |500
Handling materials|# of moves |5,000
Production |Direct labor hrs|65,000
Setting up machines|# of setups |1,000
Inspecting|# of inspections|4,000
Inventory control |# of components |40,000
Utilities|Square ft occupied|50,000
Utilities|Square ft occupied|50,000
Doug Russell, sales manager, has received an order for 12 custom mudroom storage benches from Homes by Kathy.At Doug's request, Ledger prepares costs estimates for producing 12 mudroom storage benches so Doug can submit a contract price per mudroom storage bench to Homes by Kathy.He accumulates the following data for the production of 12 mudroom storage benches.
Direct materials|$5,200
Direct labor |$3,500
Direct labor hours|200
Number of purchase orders|3
Number of material moves|32
Number of machine setups|4
Number of inspections |20
Number of components|640
Number of square feet occupied|320
Required:
1.Compute the predetermined overhead rate using traditional costing with direct materials cost as the allocation base.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started