Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Materials requisition #1247 for Job 804 shows that a total of $136 of direct materials were used in manufacturing the job. In addition to the
Materials requisition #1247 for Job 804 shows that a total of $136 of direct materials were used in manufacturing the job. In addition to the materials requisition, the labor time records show that a total of $80 of direct labor costs was incurred in producing these lamps; a total of 10 direct labor hours were worked on this job. Add direct materials and direct labor to the Job Cost Record for Job 804. Manufacturing overhead has already been added to the Job Cost Record for this job. Assume that the job was completed on September 19. Complete the Job Cost Record by calculating the total job cost and the cost per unit. Remember that this job consisted of 40 lamps (units). Snyder Lighting manufactures a variety of lamps for lighting specialty stores. In September, Snyder Lighting received an order from Zazzery Decor for 40 mission-style table lamps (Model 5A). The order from Zazzery Decor became Job Number 804 at Snyder Lighting. (Click the icon to view the additional information.) Read the requiremen .. 804 Job Number: Customer Zazzery Decor Job description: 40 Model 5A - Mission-style table lamps Date Started: Sep. 14 Date Completed: Sep. 19 Manufacturing Cost Information: Cost Summary Direct Materials Req. # 1247 Direct Labor Manufacturing Overhead 10 hours * $10 per direct labor hour $ 1001 Total Job Cost Number of Units Cost per Unit
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started