Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Materials requisition #1247 for Job 804 shows that a total of $120 of direct materials were used in manufacturing the job. In addition to the
Materials requisition #1247 for Job 804 shows that a total of $120 of direct materials were used in manufacturing the job. In addition to the materials requisition, the labor time records show that a total of $165 of direct labor costs was incurred in producing these lamps; a total of 15 direct labor hours were worked on this job. Add direct materials and direct labor to the Job Cost Record for Job 804. Manufacturing overhead has already been added to the Job Cost Record for this job. Assume that the job was completed on September 19. Complete the Job Cost Record by calculating the total job cost and the cost per unit. Remember that this job consisted of 60 lamps (units). Williamson Lighting manufactures a variety of lamps for lighting specialty stores. In September, Williamson Lighting received an order from Zlinger Decor for 60 mission-style table lamps (Model 5A). The order from Zlinger Decor became Job Number 804 at Williamson Lighting. (Click the icon to view the additional information.) Read the requirement. CE Job Number: 804 Customer: Zlinger Decor Job description: 60 Model 5A - Mission-style table lamps Date Started: Sep. 14 Date Completed: Sep. 19 Manufacturing Cost Information: Cost Summary Direct Materials 1247 Req. # Direct Labor Manufacturing Overhead 15 hours $9 per direct labor hour 135 Total Job Cost Number of Units Cost per Unit
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started