Question
MATLAB PROBLEM 2 OF 5 Problem 2 (3 points) : Component Analysis An electrical engineer supervises the production of three types of electrical components. Three
MATLAB
PROBLEM 2 OF 5
Problem 2 (3 points) : Component Analysis
An electrical engineer supervises the production of three types of electrical components. Three kinds of material -- metal, plastic, and rubber -- are required for production. The amounts needed to produce each component are:
Component | Plastic (g/component) | Rubber (g/component) | Metal (g/component) |
---|---|---|---|
1 | 0.55 | 1.5 | 19 |
2 | 0.30 | 1.0 | 15 |
3 | 0.40 | 1.2 | 17 |
Suppose that totals of 0.0795, 0.239, and 3.34 kg of plastic, rubber, and metal, respectively, are used each day. We wish to find how many of each component have been produced per day.
-
Give the equations for this linear system, making sure to identify what the unknowns are.
-
Solve your system from part a using MATLAB by creating the coefficient matrix and data vector and solving the system using the backslash operator. Make sure to identify each part of your solution.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started