Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

(MATLAB PROGRAMMING) just 3.1,3.6,3.7 Plot the function y(x) = e^-0.5x sin for 100 values of x between 0 and 10. Use a 2-point-widc solid blue

(MATLAB PROGRAMMING)

just 3.1,3.6,3.7

image text in transcribed

Plot the function y(x) = e^-0.5x sin for 100 values of x between 0 and 10. Use a 2-point-widc solid blue line for this function. Then plot the function y(x) = e^0.5x cos 2x on the same axes, Use a 3-point-wide clashed red line for this function. Be sure to include a legend, title, axis labels, and grid on the plots. Use the MATLAB AB plot editing tools to modify the plot in Exercise .3.1. Change the line representing the function y (x) = e^-0.5x sin 2x to be a black dashed line that is 1-point-wide Plot the functions in Exercise 3.1 on a log/linear plot. Be sure to include a legend, title, axis labels, and grid on the plots. Plot the function y (x) = e^-0.5x sin 2v on a bar plot. Use 100 values of v between 0 and 10 in the plot. Be sure to include a legend, title, axis labels, and grid on the plots. Create a polar plot of the function r (theta) = sin (2 theta) cos theta for 0 lessthanorequalto theta lessthanorequalto 2 pi. Plot the function f(x) = x^4 - 3x^3 + 10x^2 - x - 2 for - 6 lessthanorequalto x lessthanorequalto 6. Draw the function as a solid black 2-point-wide line, and turn on the grid. Be sure to include a title and axis labels, and include the equation for the function being plotted in the title string. (Note that you will need steam modifiers to get the italics and the superscripts in the title string.) Plot the function f(x) = x^2 - 6x + 5/x - 3 using 200 points over the range -2 lessthanorequalto x lessthanorequalto 8. Note that there is an asymptote at x = 3, so the function will tent to infinity near to that point. In order to see the rest of the plot properly, you will need to limit the y-axis to a reasonable size, so use the axis command to limit the y-axis to the range - 10 to 10. Suppose that George, Sam. Betty, Charlie, and Suzie contributed $15, $5, $10. $5. and $15 respectively to a colleague's going-away present. Create a pie chart of their contributions. What percentage of the cost was paid by Sam? Plot the function y(x) = e^-x sin x for x between 0 and 4 in steps of 0.1. Create the following plot types: (a) linear plot; (b) log/linear plot, (c) stem plot; (d) stair plot; (e) bar plot; (f) horizontal bar plot; (g) compass plot. Be sure to include titles and axis labels on all plots

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Database Experts Guide To Database 2

Authors: Bruce L. Larson

1st Edition

0070232679, 978-0070232679

More Books

Students also viewed these Databases questions

Question

1. Are my sources credible?

Answered: 1 week ago