Question
McBurger, Inc., wants to redesign its kitchens to improve productivity and quality. Three designs, called designs K1, K2, and K3, are under consideration. No matter
McBurger, Inc., wants to redesign its kitchens to improve productivity and quality. Three designs, called designs K1, K2, and K3, are under consideration. No matter which design is used, daily production of sandwiches at a typical McBurger restaurant is for
600
sandwiches. A sandwich costs
$1.30
to produce. Non-defective sandwiches sell, on the average, for
$3.10
per sandwich. Defective sandwiches cannot be sold and are scrapped.The goal is to choose a design that maximizes the expected profit at a typical restaurant over a 300-day period. Designs K1, K2, and K3 cost
$120,000,
$130,000,
and
$150,000,
respectively.Under design K1, there is a .80 chance that 90 out of each 100 sandwiches are non-defective and a .20 chance that 70 out of each 100 sandwiches are non-defective. Under design K2, there is a .85 chance that 90 out of each 100 sandwiches are non-defective and a .15 chance that 75 out of each 100 sandwiches are non-defective. Under design K3, there is a .90 chance that 95 out of each 100 sandwiches are non-defective and a .10 chance that 80 out of each 100 sandwiches are non-defective.
Part 2The expected profit level of design K1 is
$enter your response here.
(Enter
your response as a real number rounded to two decimal
places.)
The expected profit level of design K2 is
$enter your response here.
(Enter
your response as a real number rounded to two decimal
places.)
The expected profit level of design K3 is
$enter your response here.
(Enter
your response as a real number rounded to two decimal
places.)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started