Mercer Asbestos Removal Company removes potentlally toxic asbestos Insulation from bulldings. There has been a long - simmering dispute between the company's estimator and the

Mercer Asbestos Removal Company removes potentlally toxic asbestos Insulation from bulldings. There has been a long-simmering
dispute between the company's estimator and the work supervisors. The on-site supervisors claim the estimators do not adequately
distingulsh between routine work, such as removing asbestos insulation around heating pipes in older homes, and nonroutine work,
such as removing asbestos-contaminated celling plaster in Industrial buildings. The on-slte supervisors believe nonroutine work is far
more expensive than routine work and should bear higher customer charges. The estimator sums up his position in this way. "My Job is
to measure the area to be cleared of asbestos. As directed by top management, I simply multiply the square footage by $2.80 to
determine the bid price. Because our average cost Is only $2.575 per square foot, that leaves enough cushion to take care of the
additional costs of nonroutine work. Besides, it is difficult to know what is routine or not routine untll you actually start tearing things
apart."
To shed light on this controversy, the company gathered the following actlvity-based costing data:
Note: The 100 nonroutine Jobs are Included in the total of 400 jobs. Both nonroutine jobs and routine jobs require estimating and
setup.
Requlred:
Perform the first-stage allocation of costs to the activity cost pools.
Compute the activity rates for the activity cost pools.
Calculate the total cost and the average cost per thousand square feet of each of the following jobs according to the actlvity-based
costing system.
a. A routine 1,000-square-foot asbestos removal job.
b. A routine 2,000-square-foot asbestos removal job.
c. A nonroutine 2,000-square-foot asbestos removal job. Complete this question by entering your answers in the tabs below.
Required 1Required 2Required 3A to 3C
Perform the first-stage allocation of costs to the activity cost pools.
Removing asbestos Estimating and Job Setup Working on Nonroutine Jobs Other Total
Wages and salaries $0
Disposal fees 0
Equipment depreciation 0
On-site supplies 0
Office expenses 0
Licensing and insurance 0
Total cost $0 $0 $0 $0 Complete this question by entering your answers in the tabs below.
Required 1Required 2Required 3A to 3C
Compute the activity rates for the activity cost pools.
Working on nonroutine jobs per nonroutine job omplete this question by entering your answers in the tabs below.
Required 1Required 2Required 3A to 3C
Calculate the total cost and the average cost per thousand square feet of each of the following jobs according to the activity-based costing system.
Note: Round the "Average Cost per thousand square feet" to 2 decimal places.
a. A routine 1,000-square-foot asbestos removal job.
b. A routine 2,000-square-foot asbestos removal job.
c. A nonroutine 2,000-square-foot asbestos removal job.
Show less
Routine 1,000 square feet job Routine 2,000 square feet job Nonroutine 2,000 square feet job
Total cost of the job
Average Cost per thousand square feet
image text in transcribed

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Fundamental Accounting Principles Volume 2

Authors: John Wild, Ken Shaw, Barbara Chiappetta

21st Edition

0077716663, 978-0077716660

More Books

Students also viewed these Accounting questions

Question

Outline three of Vivess contributions to psychological thought.

Answered: 1 week ago