Middleton Company produces two different metal components used in medical equipment ( Component X and Component Y ) . The company has three processes: molding,

Middleton Company produces two different metal components used in medical equipment (Component X and Component Y). The company has three processes: molding, grinding, and finishing. In molding, molds are created, and molten metal is poured into the shell. Grinding removes the gates that allowed the molten metal to flow into the mold's cavities. In finishing, rough edges caused by the grinders are removed by small, handheld pneumatic tools. In molding, the setup time is one hour. The other two processes have no setup time required. The demand for Component X is 700 units per day, and the demand for Component Y is 1,140 units per day. The minutes required per unit for each product are as follows:
Minutes Required per Unit of Product
Product Molding Grinding Finishing
Component X 51015
Component Y 101520
The company operates one eight-hour shift. The molding process employs 26 workers (who each work eight hours). Two hours of their time, however, are used for setups (assuming both products are produced). The grinding process has sufficient equipment and workers to provide 420 grinding hours per shift.
The Finishing Department is labor intensive and employs 71 workers, who each work eight hours per day. The only significant unit-level variable costs are materials and power. For Component X, the variable cost per unit is $44, and for Component Y, it is $52. Selling prices for X and Y are $99 and $104, respectively. Middleton's policy is to use two setups per day: an initial setup to produce all that is scheduled for Component X and a second setup (changeover) to produce all that is scheduled for Component Y. The amount scheduled does not necessarily correspond to each product's daily demand.
Required:
1. Calculate the time (in minutes) needed each day to meet the daily market demand for Component X and Component Y.
Net Time Required
Molding fill in the blank 1
minutes
Grinding fill in the blank 2
minutes
Finishing fill in the blank 3
minutes
What is the major internal constraint facing Middleton Company?
2. Identify the product mix that will maximize daily throughput.
Number of Units Produced
Component X fill in the blank 5
units
Component Y fill in the blank 6
units
3. Assume that manufacturing engineering has found a way that will reduce the molding setup time from one hour to 10 minutes. How many units of Component X and Component Y would be produced?
Number of Units Produced
Component X fill in the blank 7
units
Component Y fill in the blank 8
units
4. For Requirements 1 to 3, identify the data analytic model used and select and justify the data analytic type(s) used. See Exhibits 2.5 and 2.6, for a review of data analytic types (descriptive, diagnostic, predictive, and prescriptive).
The major data analytic type used for Requirement 1 is
because the calculation of the time needed is telling what is happening.
For Requirement 2, the major data analytic type is
. The analysis identifies the product mix that Middleton
produce to maximize daily throughput.
For Requirement 3, the major data analytic type is
. The analysis reveals what the new product mix and daily throughput
be if the new setup time is reduced as predicted.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Accounting And Reporting

Authors: Barry Elliott, Jamie Elliott

20th Edition

1292399805, 978-1292399805

More Books

Students also viewed these Accounting questions