Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Nathan Matthews conducted a test of controls where the tolerable deviation rate was set at 6 percent and the expected population deviation rate was 3

Nathan Matthews conducted a test of controls where the tolerable deviation rate was set at 6 percent and the expected population deviation rate was 3 percent. Using a sample size of 150, Matthews performed the planned test of controls. He found six deviations in the sample and he calculated the computed upper deviation rate to be 7.8 percent.

a. Based on the sample results, what is the allowance for sampling risk is included in the computed upper deviation rate of 7.8?

b. Assume that Matthews preliminary assessment of control risk is low. Given the results above, the auditor could decide to do one of three things: (1) increase the sample size, (2) increase the preliminary assessment control of risk, or (3) not adjust the preliminary assessment of control risk. Describe how Matthews could justify each of those actions.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Auditing A Quality System For The Defense Industry

Authors: Charles B. Robinson

1st Edition

0873890787, 978-0873890786

More Books

Students also viewed these Accounting questions