Question
Nautical Awning manufactures awnings and uses a standard cost system. Nautical allocates overhead based on the number of direct labor hours. The following are the
Nautical Awning manufactures awnings and uses a standard cost system. Nautical allocates overhead based on the number of direct labor hours. The following are the company's cost and standards data:
Direct material 18.0 yards per awning at $10.00 per yard
Direct labor 2.0 hours per awning at $13.00 per hour
Variable MOH standard rate $5.00 per direct labor hour
Predetermined fixed MOH standard rate $10.00 per direct labor hour
Total budgeted fixed MOH cost $34,000
Actual cost and operating data from the most recent monthfollows:
Purchased 35,460 yards at a total cost of $333,324
Used 31,300 yards in producing 1,800 awnings
Actual direct labor cost of $45,457 for a total of 3,470 hours
Actual variable MOH cost $19,085
Actual fixed MOH cost $39,500
All manufacturing overhead is allocatedon the basis ofdirect labor hours.
Requirements
1.Calculate the standard cost of one awning.
2.Calculate the following variances:
a.The direct material variances.
b.The direct labor variances.
c.The variable manufacturing overhead variances.
d.The fixed manufacturing overhead variances.
3.Explain what each of the variances you calculated means and give at least one possible explanation for each of those variances. Are any of the variances likely to be interrelated?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started