Answered step by step
Verified Expert Solution
Question
1 Approved Answer
need anwser for C3, total manufacturing cost per stairway. will leave a like for correct answer. Sunland Stairs Co.designs and builds factory-made premium wooden stairways
need anwser for C3, total manufacturing cost per stairway. will leave a like for correct answer.
Sunland Stairs Co.designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components (spindles, risers, hangers, hand rails) permit installation of stairways of varying lengths and widths. All are of white oak wood. Budgeted manufacturing overhead costs for the year 2022 are as follows. Overhead Cost Pools Amount Purchasing $75,000 Handling materials 82,000 Production (cutting, milling, finishing) 220,000 Setting up machines 100,000 Inspecting 120,000 Inventory control (raw materials and finished goods) 126,000 Utilities 270,000 Total budgeted overhead costs $993,000 For the last 4 years, Sunland Stairs Co. has been charging overhead to products on the basis of machine hours. For the year 2022, 100,000 machine hours are budgeted. Jeremy Nolan, owner-manager of Sunland Stairs Co., recently directed his accountant, Bill Seagren, to implement the activity-based costing system that he has repeatedly proposed. At Jeremy Nolan's request, Bill and the production foreman identify the following cost drivers and their usage for the previously budgeted overhead cost pools. Estimated Use of Cost Drivers Activity Cost Pools Cost Drivers Purchasing Number of orders 600 Handling materials Number of moves 8,000 Production (cutting, milling, finishing) Direct labor hours 100,000 Setting up machines Number of setups 1,250 Inspecting Number of inspections 6,000 Inventory control (raw materials and finished goods) Number of components 168,000 Utilities Square feet occupied 90.000 Steve Hannon, sales manager, has received an order for 250 stairways from Community Builders, Inc., a large housing development contractor. At Steve's request, Bill prepares cost estimates for producing components for 250 stairways so Steve can submit a contract price per stairway to Community Builders. He accumulates the following data for the production of 250 stairways. Direct materials $104,200 Direct labor $112,700 Machine hours 15,000 Direct labor hours 5,700 Number of purchase orders. 60 Number of material moves 800 Number of machine setups 100 Number of inspections 450 Number of components 16,000 Number of square feet occupied 8.000 Your answer is correct. Compute the predetermined overhead rate using traditional costing with machine hours as the basis. (Round answer to 2 decimal places, e.g. 12.25.) Predetermined overhead rate. 9.93 per machine hour What is the manufacturing cost per stairway under traditional costing? (Round answer to 2 decimal places, e.g. 12.25.) Cost per stairway 1.463.40 Calculate activity-based overhead rate for each activity. (Round answers to 2 decimal places, e.g. 12.25.) Activity Overhead Rate Purchasing 125 per order Handling materials $ 10.25 per move Production 2.20 per D/L hour Setting up machines $ 80 per setup Inspecting 20 per inspection Inventory control $ 75 per component Utilities per sq. ft. Your Answer Correct Answer Your answer is correct. Calculate total overhead assigned under ABC. Total overhead assigned 81240 (c3) What is the manufacturing cost per stairway under the proposed activity-based costing? (Round answer to 2 decimal places, e.g. 12.25.) Total manufacturing cost per stairway Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started