Answered step by step
Verified Expert Solution
Link Copied!

Question

00
1 Approved Answer

need help with A B C need help with facotry overhead cost variance report welding department need help with 1 2 3 4 Direct Materials

need help with A B C
image text in transcribed
image text in transcribed
need help with facotry overhead cost variance report welding department
image text in transcribed
need help with 1 2 3 4
Direct Materials and Direct Labor Variance Analysis Shasta Fixture Company manufactures faucets in a small manufacturing facility. The faucets are made from brass. Manufacturing has 30 employees. Each employee presently provides 36 hours of labor per week. Information about a production week is as follows: Required: a. Determine the standard cost per unit for direct materials and direct labor. Round the cost per unit to two decimal places. b. Determine the direct materiats price variance, direct materials quantity variance, and total direct materials cost variance. Round your answers to the nearest whole dollar. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. c. Determine the direct labor rate variance, direct labor time variance, and total arrect labor cost variance. Round your answers to the nearest Equipment inc, a manufacturer of construction equipment, prepared the following factory overtiead cost budget for the welding Department for lay of the current year. The company expected to operate the department at 1004 of normal capacaty of 8,400 hours. During May, the department operated at 8,860 hours, and the factory overhead costs incurred were indirect factory wages, 532,400 ; power and light, $21,000; indirect materials, $18,250; supervisory salaries, $20,000; depreciation of plant and equipment, $36,200; and insurance and property taxes, $15,200. Required: Prepare a factory overitiead cost variance report for May. To be useful for cost control, the budgeted amounts should be based on B,860 hours. Enter a taveroble variance as a negative number using a minus slgn and an untavorable voriance as a positive number. If an amount box does not require an Standards for Nonmanufocturing Expenses CodeHead Software Inc, does software development. One important activity in software development is writing software code. The manager of the WordPro Development Team determined that the average software programmer could write 25 lines of code in an hour. The plan for the first week in May called for 4,650 lines of code to be written on the WordPro product. The WordPro Team has five programmers. Each programmer is hired from an employment firm that requires temporary employees to be hired for a minimum of a 40-hour week. Programmers are paid $32.00 per hour. The manager offered a bonus if the team could generate more lines for the week, without overtime. Due to a project emergency, the programmers wrote more code in the first week of May than planned. The actual amount of code written in the first week of May was 5,650 lines, without overtime. As a result, the bonus caused the average programmer's hourly rate to increase to $40.00 per hour during the first week in May. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. If an amount is zero, enter "0" and choose "Not applicable" from the dropdown. Required: 1. If the team generated 4,650 lines of code according to the original plan, what would have been the labor time variance? 2. What was the actual labor time variance as a result of generating 5,650 lines of code? 3. What was the labor rate yarlance as a result of the bonus? 4. The manager is trying to determine if a better decision would have been to hire a temporary programmer to meet the higher programming demand in the first week of May, rather than paying out the bonus. If another employee was hired from the employment firm, what would have been the labor time variance in the first week? 5. Which decision is better, paying the bonus of hiring another programmer? Feecthack - Crea uy Wis

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions