Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Need help with Problem and really confused with plugging the values for MATLAB. Can anyone help with this problem? Really appreciate and will rate if

Need help with Problem and really confused with plugging the values for MATLAB. Can anyone help with this problem? Really appreciate and will rate if there is explanation. Also, could you upload the matlab code that you use? Thanks!

image text in transcribedThe link for the matlab code : https://gist.github.com/Ari100tell/7863351

Q2. A rectangular prism shaped metallic container is to be designed for storage of nuclear waste materials. The profit to be made from constructing the container is proportional to its volume and can be expressed through the factor P which is $50k/m3. Sheet metal processing cost for the 5 faces of the container is proportional to the surface area and can be determined through the cost factor Cashaping which is S2.5k/m2. The final face of the container wil be welded to the container through a specialized MIG welding process having a cost proportional to the length of the weld line. The associated cost factor Cawelding is S7.5k/m. Safety code for nuclear waste containers dictate the average of the three dimensions of the container as 4m. For a maximunm profit, what should be the dimensions? Hint: Use the Hooke and Jeeves algorithm with a starting dimension of 4 m for all sides. A MATLAB program to find a function minimum using the Hooke-Jeeves directional search method can be accessed through the following link: Q2. A rectangular prism shaped metallic container is to be designed for storage of nuclear waste materials. The profit to be made from constructing the container is proportional to its volume and can be expressed through the factor P which is $50k/m3. Sheet metal processing cost for the 5 faces of the container is proportional to the surface area and can be determined through the cost factor Cashaping which is S2.5k/m2. The final face of the container wil be welded to the container through a specialized MIG welding process having a cost proportional to the length of the weld line. The associated cost factor Cawelding is S7.5k/m. Safety code for nuclear waste containers dictate the average of the three dimensions of the container as 4m. For a maximunm profit, what should be the dimensions? Hint: Use the Hooke and Jeeves algorithm with a starting dimension of 4 m for all sides. A MATLAB program to find a function minimum using the Hooke-Jeeves directional search method can be accessed through the following link

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Database Marketing The Ultimate Marketing Tool

Authors: Edward L. Nash

1st Edition

0070460639, 978-0070460638

More Books

Students also viewed these Databases questions

Question

Classify delivery styles by type.

Answered: 1 week ago